We design and build air coolers for gas compression, new and replacement, engineered for your site’s real climate. For packages that can’t hold temperature: same skid, same connections.
Compression packages are designed for one climate and run in another. In hot sites, the cooler that came with the package often can’t keep up.
The site runs at 95–113 °F (35–45 °C), hotter than the package’s design climate.
The cooler can’t reject enough heat, so gas enters the next stage hot.
The compressor moves less gas, or trips on high temperature.
Less gas to sales or injection: fewer barrels and less revenue.
−9%
flow for every +10% of absolute suction temperature: hot gas is less dense.
Trips
on high temperature, linked to coolers that fall short on hot days.
Barrels
lost: in gas lift, compressor downtime is one of the main causes of lost production.
Sources: Industrial Monitor Direct (flow vs. temperature physics); Lu et al., University of Queensland (coolers in gas compression); Southwestern Petroleum Short Course 2026 (gas lift downtime).
See how many months it takes to recover a replacement cooler from the production you are losing today. Change the values to match your operation.
2.5
months to pay back the investment
Simple reference calculation; starting values are an example. Our diagnostic calculates the real production loss at each site.
With your flow, temperatures, gas data and site climate, we tell you whether the cooler keeps up and how much production you are losing.
New coolers for compression packages and process, rated from the start for the site’s hottest days. Built in Brookshire, TX and Colombia.
Engineered for your real temperature, on the same skid and with the same connections, so the swap is fast.
Replacement bundles and sections, fans, louvers, retubing and hydrostatic testing.
Air coolers engineered for LNG service in West Africa and for gas compression packages in Latin America.
Manufacturing in Brookshire, TX and in Colombia: competitive prices and short lead times.
Direct replacement, no package redesign.
Engineered for your climate, not a catalog.
Tell us about your package and we’ll tell you whether the cooler is limiting production. For the diagnostic we ask for:
Gas flow and suction and discharge pressures per stage
Current cooler outlet temperatures and site ambient temperature
Compressor model and dimensions of the current cooler or skid
High-temperature trips in recent months, if any